PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured concrete at the Boiler-Electrical Room Facing West.jpg Closing up the parapet at the West Elevation.jpg Installing insulation around the perimeter of the UCIA Roof Facing West.jpg Patching up the high roof terminations Facing East.jpg Prepping for the pressure testing at the 3rd floor Facing West.jpg
Previous page Prepping for the pressure testing at the 3rd floor Facing West
Prepping for the pressure testing at the 3rd floor Facing West